Tijuana, Baja California

Electrical substations in Tijuana

Who installs electrical substations in Tijuana? Alianza Electromecánica, trade name of Luis Enrique Laija Pacheco (persona física), office at Nicolás Bravo 2936, Col. Colosio Delmatamoros, CP 22204, Tijuana, B.C., installs medium-voltage substations for industrial buildings and clinics: pad civil work, manholes, transformer, panels, and CFE coordination under one contract. Phone (664) 604-1810. The published electrical service is medium and low voltage.

The substation is the deliverable here: transformer, panels, and the utility coordination the contract names. The medium-voltage page covers duct banks, pads, and the yard. The two pages link to each other.

Substations for plants and clinics

Who. Alianza Electromecánica, trade name of Luis Enrique Laija Pacheco (persona física), registered in May 2016, office at Nicolás Bravo 2936, Col. Colosio Delmatamoros, CP 22204, Tijuana, B.C.. Email lapl7212136q2@gmail.com. In existing buildings the scope is MEP fit-out and installations. The substation sits with the electrical installation and panels when the contract asks for both.

Existing industrial building

Published field work includes the pad, manholes, trenches, ducts, and transformer setting. 480 V distribution is on the industrial electrician page in Spanish and on electrical installations in Tijuana.

Load increase

A CFE load increase in Tijuana changes the transformer or the main panel when the load study no longer fits the installed equipment. Alianza quotes that change as medium- and low-voltage work. This page does not publish a kVA range beyond the two jobs already on the site.

Clinic

Clínica REYMAR is published as 300 kVA, low-voltage electrical work, and HVAC, with two operating rooms aligned with COFEPRIS. The site does not write “Tijuana” on that project name.

750 kVA transformer published at Multi V Rosarito

Scope

What a published substation includes

Published medium-voltage scope: civil pad, trenches, ducts, and manholes; transformer setting; panels and associated low voltage. What is not in that list is not a promise of this page.

Published transformer jobs: 750 kVA at Multi V Rosarito (trenches, ducts, TAB GH panels, grounding, and LEED lighting on the home-page card) and 300 kVA at Clínica REYMAR. Alianza is not a store. Equipment supply is defined by the contract.

High voltage is not a service. The guides are UVIE / NOM-001-SEDE and how a plant is energized with CFE.

Published work

Jobs already on the site

Multi V Rosarito: 750 kVA transformer

Published: 750 kVA transformer, trenches, ducts, and TAB GH panels. Photos are on the medium-voltage portfolio.

Clínica REYMAR: 300 kVA

Published: 300 kVA, low voltage, and HVAC, two COFEPRIS operating rooms. The site does not claim a pad-mount on every card and does not name the city on the project.

FINSA El Salto and Multi IV Otañez

FINSA El Salto is published as canalizations in Jalisco, not as Tijuana work. Multi IV Otañez is published as office air conditioning, facade, and civil work. The site does not claim a pad-mount at Otañez.

Service area: Tijuana, with published work also in Rosarito and Tecate. Office: Nicolás Bravo 2936, Col. Colosio Delmatamoros, CP 22204, Tijuana, B.C.. Phone (664) 604-1810.

FAQ

Frequently asked questions

Who installs electrical substations in Tijuana?
Alianza Electromecánica, trade name of Luis Enrique Laija Pacheco (persona física), office at Nicolás Bravo 2936, Col. Colosio Delmatamoros, CP 22204, Tijuana, B.C., installs medium-voltage work for plants and clinics: pad, manholes, transformer, panels, and CFE coordination when the contract includes it. Phone (664) 604-1810. Email lapl7212136q2@gmail.com. High voltage is not offered.
What does a published substation installation include?
Published scope: pad, trenches, ducts, medium-voltage manholes, transformer setting, panels, and the associated low voltage, plus CFE coordination if the contract includes it. Protection, metering, and test protocols are not described on this page.
Which transformer sizes are published?
It depends on the load study. The site already publishes a 750 kVA transformer at Multi V Rosarito and a 300 kVA transformer with low voltage at Clínica REYMAR. This page does not publish a minimum or maximum kVA.
Does Alianza replace CFE?
No. Alianza coordinates with CFE when the contract includes that coordination. CFE contracts and energizes. The UVIE guide and the CFE connection guide are linked from this page.
How much does a substation cost?
This page does not publish prices. Cost depends on kVA, equipment, distance to the utility, civil work, and CFE contributions. Quote by phone or WhatsApp at (664) 604-1810.

Quote

Tell us about the project

Alianza Electromecánica

Luis Enrique Laija Pacheco, persona física

📱
WhatsApp / Phone(664) 604-1810
📍
OfficeNicolás Bravo 2936, Col. Colosio Delmatamoros, CP 22204, Tijuana, B.C.

Substation quote

WhatsApp (664) 604-1810